The primary goal of the WP5 demonstration is to establish complex grid management and power line health system and test its entire operation at different locations in Europe. After the demonstration’s preparation phase, the next step was the integration of the system components and the system installation. Without the completion of these tasks, the demonstration phase of the project cannot begin. These main tasks include three significant steps; the laboratory tests of the applied sensors, integration of the system components, and installing the equipment.